Sterling Don Excavation

Sitework and underground utilities including; Sewer, Culinary Water, Irrigation, Land Drain, Storm Drain, Power Trenching, Curb and Gutter, Sidewalks, Roadway Construction and Grading, Excavation for Foundations.

Reshaped the existing Detention pond and increased the size by 300 percent to allow sediment to settle before reaching the outlet.

HENRY ERYING BUILDING ADDITION

TOSCANA MULTI FAMILY - (113 UNITS)

BRIDLE UP HOPE

WATERS EDGE SUBDIVISIONS - (PHASES 1A, 1B, 2A, 2B, 2C, 4A, 5A, 5B, 5C, AND 7B)

Sitework and underground utilities including; Sewer, Culinary Water, Irrigation, Land Drain, Storm Drain, Power Trenching, Curb and Gutter, Sidewalks, Roadway Construction and Grading, Excavation for Foundations.

Listed below are a few examples of projects completed

VINEYARD RDA PHASE #13

This project consisted of 375' of new 10" Forced main sewer, 690' of pipe bursting from 8" to 12", New Sewer manhole, Reconstruct existing sewer manholes, 6" Pressurized irrigation line, asphalt patch and repair, Curb, Gutter and Asphalt trail repair. 

Complete Road Construction including over 3,000' of 10" Sewer, 8" forced sewer main, 3,800' of 10" Land Drain, 3,900' of 12" Waterline, 1,600' of 8" Waterline with associated valves, tees, bends, crosses, fire hydrants, etc. 4,300' of 42" RCP Irrigation pipe, 6,200' of 15" - 36" RCP Storm Drain, 48" and 60" Concrete Manholes, Concrete Irrigation Vaults, Storm Drain Combo Boxes, Catch Basins, Hydrodynamic Separator Vaults, Dry Utilities, Asphalt Trails, Sidewalks, Curb and Gutter, Asphalt Milling and paving. Mass Excavation of Peat Moss and Import Fill.

Clear Site, Remove Existing Concrete, Over Excavate for footings, Haul and process structural fill under footings, Backfill and Compact, prep for exterior and interior concrete slabs.

DRY CREEK SEWER REHABILITATION

Clear and Grub site, Mass grading for riding trails, Outdoor Arena, Corrals and roadways. Underground utilities. Import Arena materials and prep Arena.

LECHEMINANT SUBDIVISIONS - (PHASES 1 - 4)

"Perfect's Close Enough"

Underground utilities, Sitework, Roadway and Parking Lot Construction, Excavation of Building Pads, Sidewalk, Curb, Gutter, Grading, and Concrete prep.

DRY GULCH IRRIGATION POND EXPANSION